1.5M square yards of 5” and 7” RCC Pavement for the majority of paving areas at the Honda facility in Lincoln, AL as well as 4” of CTB in most areas of the line two expansion. RCC was selected in lieu of asphalt paving, starting in 2000, with an estimated client cost savings of 30% on the overall site paving package. The Honda Facility is the largest paving application of RCC in the world.