Barbours Cut – Container Yard I

A.G. Peltz Group rebuilt Container Yard I at Barbours Cut Terminal with 69,000 CY of 18” RCC, using advanced pavers and mixing 40,000 CY of...

Barbours Cut – Container Yard I

A.G. Peltz Group paved 69,000 cubic yards of 18” RCC for a rebuild of Container Yard I at the Barbours Cut Terminal. The project included the removal of the existing pavement as well as the mixing (A.G. Peltz Group) of 40,000 yards of conventional reinforced concrete. A.G. Peltz Group utilized multiple pavers (ABG, Vogele) as well as a material transfer device to provide a consistent product and minimize construction joints.

Work with us

With over 80 years of combined experience in our team and over 11,000,000 cubic yards of concrete placed across the US, A.G. Peltz Group are pioneers in the paving industry. More about us

We can handle your largest project from concept to creation.

Project Details

Owner

Port Houston

Project Designer

Klotz and Associates

General Contractor

McCarthy Building Companies

Completion Date

June 2018

Paving Method/s