Bayport Terminal Complex


RCC (95,575 cubic yards) was selected in lieu of PCC pavement for heavy loading conditions for a new container yard. The project consisted of 144,000 square yards of 18” RCC pavement and 61,000 square yards of 14” RCC pavement. RCC production rates routinely exceeded 400 cubic yards per hour with many days’ production exceeding 3,000 cubic yards per shift. The entire surface of the pavement was micro-milled to meet the surface smoothness tolerance specification. The POHA elected not to saw cut joints in the RCC, preferring to let the pavement crack naturally. The POHA was extremely pleased with this first RCC project and have since let three additional RCC Paving projects at Bayport.