Mixing and paving of 80,000 square yards of 7-inch and 9-inch pavement for a expansion to the manufacturing facility. Completed May 2002.
Mixing and paving of 80,000 square yards of 7-inch and 9-inch pavement for a expansion to the manufacturing facility. Completed May 2002.
The project consisted of 14” RCC for packer pads and 17″ RCC for the gantry crane wheel path as well as 6″ RCC for the trailer storage. Phase I and Phase II combined to approximately 50,000 cubic yards of 650 PSI flexural and 4,500 PSI compressive. In addition, Peltz placed […]
125000 square yards of 7″ RCC pavement for the Honda Logistics Improvements at the Lincoln, AL manufacturing facility. A.G. Peltz Group LLC was responsible for all site paving and base construction on the project. Paving system utilized 4″ of cement treated base which allowed the owner to use completed base […]
First use of RCC on an interstate roadway application in the United States. This project won the 2006 National Partnership for Highway Quality Silver Award and SCAN Innovation Award. The project consisted of over 35 lane miles of shoulder replacement with 6” and 8” RCC. Read More – Rolling Out […]
16500 cubic yards of State Route Shoulder and Median Construction. State Route 6 was completely reconstructed using continuously reinforced concrete for the travel lanes and RCC for the outside shoulders and median pavement. Project marked the first time RCC was used in the travel way on a State Route in the […]
12750 CY of RCC produced and placed in 9″ lifts using paving equipment. The use of paving equipment allowed the dam to be constructed with a minimum use of formwork, which enhanced the construction schedule. Read More
A.G. Peltz Group provided the RCC paving for the reconstruction of the intermodal facility at Toluca, Mexico. The container yard now consists of approximately 120,000 square yards of 17” RCC pavement.
A.G. Group, LLC placed 9900 SY of 8″ RCC for the Kia Facility in West Point, GA in the 2009/10 time frame. The yard is used for trailer storage. In 2020, the yard was reviewed by AGP personnel to assess its performance. The RCC is functioning as intended with no […]
In 2008, A.G. Peltz placed 19,800 SY of 12″ RCC at exit 6 in West Point, GA. The RCC was utilized for on the shoulders on the entrance and exit ramps to the interstate. The job was particularly challenging from a construction standpoint as it had to be paved utilizing […]