I-85 Kia Interchange, Ramps, and Shoulders
In 2008, A.G. Peltz placed 19,800 SY of 12″ RCC at exit 6 in West Point, GA. The RCC was utilized for on the shoulders on the entrance and exit ramps to the interstate. The job was particularly challenging from a construction standpoint as it had to be paved utilizing […]