US 78 South Carolina


The SCDOT was having a significant problem with asphalt rutting on high traffic US 78 near Charleston. The existing roadway was built on poor soils and SCDOT needed a durable pavement option which could be placed quickly and minimize traffic disruption. A 10” single lift RCC layer with a 2” asphalt surface fit their needs perfectly.