ThyssenKrupp Steel Facility


AG Peltz Group placed 128,000 square yards of 12” RCC pavement and 135,000 square yards of 8” RCC pavement in 2011/2012. The owners selected RCC in lieu of asphalt pavement for the expected serviceability, specifically RCC’s ability to withstand heavy repeated loadings without incurring significant maintenance costs.

RCC was again selected as the pavement of choice by Thyssen Krupp for the Steel Warehouse facility and Melt Shop in 2013. The surface texture of the RCC Pavement at TK is among the “tightest” ever placed by AG Peltz Group, LLC. Vulcan Materials and Holcim Cement were the material suppliers for AGP on these projects.