In 2008, A.G. Peltz placed 19,800 SY of 12″ RCC at exit 6 in West Point, GA. The RCC was utilized for on the shoulders on the entrance and exit ramps to the interstate. The job was particularly challenging from a construction standpoint as it had to be paved utilizing multiple pavers (dual lift) with limited space for equipment. The attached pictures are from a recent evaluation (4/2020) of the project by AGP personnel. With a few exceptions at the end of daily pulls, AGP did not notice any unusual distresses and the shoulders appears to be functioning as intended.