A.G. Peltz placed 23,400 SY of 10” PCC Pavement on Hwy 20 in Decatur, AL. ALDOT selected concrete due to the heavy truck traffic on this route. The concrete was placed on 6 inches of cement treated subgrade and a 4-inch layer of asphaltic base. A.G. Peltz Group LLC had 22 paving days on this project which was placed under traffic……. Project was constructed using a Miller slip form paver and a Bidwell Roller Paver.