FEC ICTF Port Everglades


AGP placed approximately 18,750 CY of 9” pavement, 7,853 cy of 12” pavement, and 1,955 cy of 18” pavement on new container transfer facility for the Florida East Coast Railways. The RCC was placed at 25-30 foot pavement lanes with control joints cut both transverse and longitudinally at 12.5-15 feet. The FEC selected RCC in lieu of HMA based on the long-term performance expectations of the pavement and low maintenance cost expectations.