Birmingham Regional Intermodal Facility
AG Peltz mixed and placed over 60,000 cubic yards of 9” & 16” RCC from July-October of 2012. The RCC was placed in 25 foot lanes with both longitudinal and transverse control joints saw cut at 12.5-15 foot intervals. RCC was used for all of the container and trailer storage […]