Bayport Terminal Complex
Seabrook, TX
Container Yard Pavement

Paving Date: 2007
RCC (95,575 CY) was selected in lieu of PCC Pavement for heavy loading conditions for a new container yard. RCC Production rates routinely exceeded 400 cy per hour with...

- Details -



Norfolk International Terminals (NIT) Backlands Renovations
Norfolk, VA
Container Yard Pavement Renovation

Paving Dates: 2005-2010
Initial project specified RCC in 2005 based on comparison of four Pavement systems including PCC, Asphalt, Pavers, and RCC. The asphalt section was subsequently elim...

- Details -



Rattlesnake Hollow Ash Pond Crest Raise
Gorgas, AL
Dam Crest Raise

Paving Date of 2007
12750 CY of RCC produced and placed in 9" lifts using paving equipment. The use of paving equipment allowed the dam to be constructed with a minimum use of formwork.

- Details -



State Route 6 RCC Shoulders and Median Construction
Powder Springs, GA
Georgia DOT Shoulder Reconstruction

Paving Date of 2006
16500 cubic yards of State Route Shoulder and Median Construction. State Route 6 was completely reconstructed using continuously reinforced concrete for the travel lane...

- Details -



I-285 Shoulder Replacement
Atlanta GA
Georgia DOT Shoulder Reconstruction

Paving Date of 2005-2006
Over 35 lane miles of asphalt shoulder replacement with 6" & 8" RCC. The project was the first use of RCC in an Interstate Roadway application. It won the 2...

- Details -



Honda Automobile Plant
Lincoln, AL
Industrial Pavement

Paving Dates: 2000-2004, 2007
Description: Over 1,500,000 SY of 5" and 7" RCC Pavement for the majority of paving areas at the Honda facility in Lincoln, AL as well as 4" of CTB in most ar...

- Details -



Honda Logistics Improvements
Lincoln, AL
Industrial Pavement

Paving Date: October 2007
125000 square yards of 7" RCC pavement for the Honda Logistics Improvements at the Lincoln, AL manufacturing facility. A.G. Peltz Group LLC was responsible for al...

- Details -



Choctaw Point Container Terminal
Mobile, AL
New Container Terminal

Paving Dates - 2008, 2009
RCC was bid against and selected in lieu of asphalt for two main reasons: 1) cost savings and 2) an expedited project schedule. AG Peltz began paving in May of 2...

- Details -



KCS Railway
Kendleton, TX
Paving

Paving Date: 2008, 2010

The project consisted of 14” RCC for packer pads and 17" RCC for the gantry crane wheel path as well as 6" RCC for the trailer storage. Phase I and Phase II combin...

- Details -



Siemens USA Interior Slab Floor
Hutchinson, KS
RCC

A.G. Peltz completed the mixing for the Roller Compacted Concrete utilized for the interior slab system for Siemens USA. This consisted of approximately 230,000 square feet or 7,950 cubic yards of RC...

- Details -



Mercedes Benz USA
Vance, Alabama
Roller Compacted Concrete

Paving Dates: 2002
Mixing and paving of 80,000 square yards of 7-inch and 9-inch pavement for a expansion to the manufacturing facility. Completed May 2002.

- Details -



Central Freight Lines
Austin, Texas
Roller Compacted Concrete

Paving Dates: 1987
Central Freight Lines and Tuscany Way Street in Austin Tx - Project consisted of 20,000 cubic yards of RCC for a freight terminal and a city street. Peltz was responsible...

- Details -



Big Horn Ave.
Alliance, NE
Roller Compacted Concrete

Paving Date: 1992
This project consisted of designing and building a Roller Compacted Concrete Street to equal that of conventional concrete. Peltz was responsible for supplying a specifica...

- Details -



Hornsby Bend
Austin, Texas
Roller Compacted Concrete

Paving Date: 1986
Project consisted of 60,000 cubic yards of RCC placement in the bottoms and on the side slopes and tops of newly constructed waste storage ponds. Placement was done on 3:1...

- Details -



B.N. Inter Modal Yard
Denver, Colorado
Roller Compacted Concrete

Paving Date: 1986
Burlington Northern Intermodal Yard in Denver Colorado - Project consisted of 60,000 cubic yards of RCC Paving. Peltz was the concrete paving contractor responsible for al...

- Details -



Sherman Block Plant
Birmingham, Alabama
Roller Compacted Concrete

Paving Date: 2000
Design, Mixing and paving of 3600 cubic yards of 7 inch pavement. Project served as demo for the ACPA, Lehigh Cement, and local equipment dealers.

- Details -



Dam
Thomaston, Georgia
Roller Compacted Concrete

Project Date: 2002
This project consisted of 20,000 cubic yards of RCC. Peltz was the general contractor responsible for all phases of construction including design, mixing, placement and c...

- Details -



Hyundai
Montgomery, Alabama
Roller Compacted Concrete

Paving Date: 2004-2006
Mixing and placement of 255,000 square yards of 8-inch and 9-inch pavement for a new manufacturing facility. Completion July 2004.

- Details -



New South Express Distribution Center Phase 1
Talladega, Alabama
Roller Compacted Concrete

Paving Dates: 2000, 2002, 2005
Project consisted of the paving the base (4" Aggregate base course) and approximately 35,000 cubic yards of 7" patented "SPALLESS" Roller Compacted Concrete P...

- Details -



US Hwy 84, Andalusia, AL - Phase I & II
Andalusia, AL
Soil Cement

Paving Dates: 2007, 2008
Soil Cement on US 84, Andalusia, AL. Approximately 267,000 SY of 8" Soil Cement placed as an aggregate base layer on US 84. AG Peltz performed this project utilizin...

- Details -