Size: 125000 SY of 7” RCC Pavement on 4” of Cement Treated Base
24500 CY of RCC material produced and placed

Type: Industrial Pavement

Customer: Honda Manufacturing of Alabama – Repeat Customer

Designer: BE&K, Jeff Smith

Contact:

Description:

125000 square yards of 7” RCC pavement for the Honda Logistics Improvements at the Lincoln, AL manufacturing facility. A.G. Peltz Group LLC was responsible for all site paving and base construction on the project. Paving system utilized 4” of cement treated base which allowed the owner to use completed base layers as staging areas for building materials with little concern for inclement weather.

Honda Logistics Improvements
Lincoln, AL