Size: 293,000 SY of 8” RCC Pavement
110,000 SY of 15.5 RCC Pavement
403,000 SY of 6

Type: New Container Terminal

Customer: APM Terminals – A Division of Maersk

Designer:

Contact: NNPI: Mark Smallridge 972-624-8817

Description:

RCC was design as an alternative to a comparable asphalt section and awarded via low bid. The existing soils will be treated with a 6” soil cement in Spring of 2008 with RCC to follow. 8” of RCC will be used for the medium duty paving section and 15.5” of RCC will be used for the heavy duty pavement section.

Choctaw Point Container Terminal
Mobile, AL